General Inspection and Test Plan(ITP)

Serial Number

Process

Control

Specifcations or Requirements

Monitoring Method/Frequency

Record

Person in charge
1

Receiving inspection

Related Quality

Control program for procurement

Specification for Receiving Inspection

Specification for material 35CrMo casting

Specification for material Q345

Specification for rubber raw material

Testing technology of cementing compound

Audd the mill test report or re-inspect
every procurement

Inspection on APl 16A metal pars,also as the final inspection.

Raw material mill test report

Record of receiving inspection

QC

2 Burdening Correct ingredient

Ingredient

Operation instruction for burdening

The ingredient and mixing technology are patents of our company. lt is controlled by specifled person. Record of material

QC

3

Mixing

Rubber compound property

Operation instruction for mixing

Aeceptance criteria for producing rubber

Sampling 100%  of the rubber compound, full inspection of every car

Final judge according to MAC ot rubber material

Record of rubber physical property testing

QC

4 Shot blasting of the support rib

Appearance

Specification for shot blasting

Quality control in process Not required

QC

5 Cementing of the support rib

Operating instruction

Cement tecnnolegy Quality control in process Treaiment records of lron

QC

6

Vulcanization

Temperature, Pressure, Time

Operation instruction of vulcanization

Vulcanization Process Sheet

Sell-inspection and in process qualily control by QC

Self-inspection record

In process quality control of vuicanizing shop

Production department

7 Trinming,appearance
inspection

Appearance and size

Specification for product handling

Manufacturing MAC

Full inspection of appearence

Hardness of metal parts, see mill tast report

Sampling inspection of the size

Inspection record

QC

8 Water pressure test on annular packing elernents diameter only on annular packing elements Seal perlormance test on annular packing elements

Full  test

Records of the seal pertormance of the annular packing elements and diameter testing

QC

9 Mark(when delivery) Compliance of the mark

Operation instruction of product mark

Requirement of Customer

100%

NA

Warehouse

Address: Jiangyou City, Sichuan Province, the fourth phase of Metallurgical Industrial Park 11, 12 workshop

Two-dimensional code

Scan

Copyright©1997-2024 Sichuan Xinwei Rubber & Plastic Co., Ltd. All Rights Reserved

SAF Coolest v1.3.1.2 设置面板FWSSX-ASJR-FSSEE-ADA

无数据提示

Sorry, the current column is being updated, please look forward to it!

You can view other columns or returnHome Page

V1.3.1 SVG图标库请自行添加图标,用div包起来,并命名使用