VBR Ram Packer -Type U
Main products: high-end rubber seals for oil and gas drilling and production equipment, a total of more than 20 series of more than 3,000 varieties, to achieve high-pressure and complex well rubber core localization.
Key words:
Rubber seal
Classification:
Product Description
VBR Ram Packer
VBR Ram Packer -Type U

The packing element can be applied to several sizes of the drill tools, especially for combination tool and hexagonal drill pipe. There is no need to change ram frequently for different size of drill tools in the whole process.
Dimension
|
BOP SIZE |
Work pressure |
Drill pipe size range |
|
13 5/8" |
10,000 psi |
4 1/2"-7" |
|
15,000 psi |
2 7/8"-5" |
|
|
15,000 psi |
3 1/2"-5 1/2" |
VBR Ram Packer 2

Dimension
|
BOP SIZE |
Work pressure |
Drill pipe size range |
|
11" |
5,000 psi |
2 7/8"-5" |
|
13 5/8" |
10,000 psi |
2 7/8"-3 1/2" |
|
3 1/2"-5 1/2" |
||
|
3 1/2"-5" |
||
|
5"-5 1/2" |
VBR Ram Packer 3

|
BOP SIZE |
Work pressure |
Drill pipe size range |
|
13 5/8" |
10,000 psi |
3 1/2"-5" |
|
10000 psi |
5"-5 1/2" |
VBR Ram Packer 4

Discription
This kind of VBR packer is installed on the maximum specification of ordinary ram blocks( for example, 5"-5 1/2" packing should be installed on the 5 1/2" ram block), thus can seal on different sizes pipes within the diameter range. The two small inserts in the middle along with the big insert fan shaped slide outward as pipe size become larger and along with the big insert fan shaped slide inward as pipe size become smaller.
Feature
1, It is applicable to existing well control BOP ordinary ram block, as long as the existing ordinary ram block is available, it can be used to install the new utility model variable packer. 2, a kind of VBR packer can be applied to seal on a variety of specifications drill pipe within a certain range. For 3 1/2" - 5" VBR packer, it can be installed on 5" ordinary ram block to seal on 3 1/2", 4", 4 1/2" and 5" drill pipe, thus reduce the store and change of these three kinds of ordinary ram packers and ram blocks; save and reduce the store and c hange of these three kinds of ordinary ram packers and ram blocks; save and reduce a lot of manpower, material resources and financial resources; speed up the drilling progress; when change the ram assembly, greatly reduced the risk of well control.
|
BOP SIZE |
Work pressure |
Drill pipe size range |
|
7 1/16" |
5,000 psi |
2 7/8"-3 1/2" |
|
2 3/8"-3 1/2" |
||
|
3 1/2"-4 1/2" |
||
|
10,000 psi |
2 7/8"-3 1/2" |
|
|
11" |
10,000 psi |
2 7/8"-3 1/2" |
|
13 5/8" |
10,000 psi |
3 1/2"-5" |
|
5"-5 1/2" |
||
|
Double faced 11" |
5,000 psi |
5"-7" |
|
10,000 psi |
3 1/2"-5" |
Previous Page
Next Page
Related Products
Address: Jiangyou City, Sichuan Province, the fourth phase of Metallurgical Industrial Park 11, 12 workshop
Scan
Copyright©1997-2024 Sichuan Xinwei Rubber & Plastic Co., Ltd. All Rights Reserved
SAF Coolest v1.3.1.2 设置面板 FWSSX-ASJR-FSSEE-ADA
无数据提示
Sorry, the current column is being updated, please look forward to it!
You can view other columns or returnHome Page